Installation of hydraulic swing beam shear

2011-12-07
  1. Packing / Shipment of swing beam shear

All machines left the factory are packed and fixed with squaring arm and foot panel tied to the hand guard. A bag of working hand tools and operation manual is lock inside the electrical panel. All exposed surfaces on machine are coated with rust guard, easily removable by kerosene or solvent.

 

  1. Lifting the swing beam shear

Use only approved and safe wire rope to lift this machine from two lifting point which is located at both side frame of the machine.

 

  1. Foundation

All our hydraulic swing beam shears are designed to be free standard. However, a good quality reinforced concrete floor with a minimum thickness of 150mm should be used.

 

  1. Installation

This machine must be properly leveled to give a good cut. Leveling is done by putting a good leveling gauge at the plate hold down area. Always pre-prepare five pieces of base plate (dimension 150 × 150 × 9mm, minimum) below machine footing to prevent leveling screw from digging into the concrete floor. On completion of leveling, a cement grout mixture must be packed under and around the feet to maintain correct leveled position.

 

  1. Electrical Installation

Be sure that the local power supply is suitable for hydraulic shearing machine before any electrical power up. Connect power cable to the bottom left of electrical panel to R.S.T.E. terminal.

 

Some shear machine may require N (Neutral) wire connection.

Author:admin | Categories:guillotine shear | Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>